Programme 3 · How is the transition counted?
Measuring transitions
What do accounting standards omit, how uncertain are their figures, and what risk does that carry?
STATUS · Concept and working paper; methods tested in other programmes
What the programme covers
This programme studies how transitions are counted: the emission factors, life-cycle assessments, standards, labels and disclosure rules on which plans, purchases and investments rely. A figure is only as reliable as the boundary, conventions and method behind it.
It examines what those methods omit, how far defensible methods disagree, and which decisions change once the omission is counted. It develops ways to report a result with its uncertainty rather than as a single number, and it assesses both the claims made with these tools and the tools themselves. It serves those who set standards, allocate capital or must decide whether to trust a claim.
What the figures leave out
An emission factor is one number. Behind it sit a boundary, a set of conventions and a choice between several defensible methods. What falls outside the boundary counts as zero. The spread between methods disappears into a single figure. When rules change, assets valued on that figure can be re-rated. We treat the gap itself as the object of study.
Scope
| Object | Assets and activities; the standards that assess them |
|---|---|
| Method | Sector-agnostic |
| First application | Cement and concrete |
Selected work
Examples of current work. The programme is not limited to them.
Also shown here
Also shown here: The forest carbon cost of wood products (Provisional results), for its allocation and uncertainty methods. The programme also draws on methods from the cement and concrete assessment.
Methods
Where the research ends
- 01Gap assessments of assets: what is omitted, how uncertain the figure is
- 02Assessments of standards and regulatory frameworks themselves, with an independent rating initiative in preparation
Allocating capital, setting standards or assessing claims?
Discuss this programme